Pecos, TX Incoming Gas Processing Equipment Upgrades, Out Station Meter, 6” Lateral & Hot Tap

Petrochemical

Client

Axis

Project Year

2021

Project Scope

Project Management

Services

  • Construction engineering and management

Markets

  • Petrochemical LNG

This project in Pecos, Tx. consisted of constructing a new site adjoining an active gas processing facility, installing new vertical separator, dehydration equipment, emergency flare system, contact water return pump and system, custody transfer meters, and additional facility & meter station lighting. The Pipeline portion of the project was 6,000’ of 6” ending with a high-pressure hot tap of 6” on 24” pipe @1200 psi. Post hydro test the line and equipment were dried to -60 dew point. Our crews were asked to also aid in commissioning of the new propane system.